OA Library

Briggle Beck Pipeline, Cumbria: Evaluation and Watching Brief Report

Wegiel, Becky (2011) Briggle Beck Pipeline, Cumbria: Evaluation and Watching Brief Report. [Client Report] (Submitted)

[thumbnail of L10372_BriggleBeck_FullRep.pdf]
Preview
PDF
L10372_BriggleBeck_FullRep.pdf

Download (5MB) | Preview

Abstract

United Utilities proposed the construction of a c 1.5km pipeline from Langwathby (NGR NY 56483 34255) to Winskill (NGR NY 57822 34865), with an additional c 4km section heading south-eastwards (NGR NY 57115 34357 to NY 60702 32628). Following the results of a rapid archaeological desk-based research and a walkover survey (OA North 2008) the Cumbria County Council Planning Archaeologist recommended that a programme of archaeological works be carried out for the proposed pipeline route. This comprised evaluation trenching within Field 3, where a large area of sub-circular cropmarks had been observed, and in addition, an archaeological watching brief along those sections of the pipeline easement subject to topsoil stripping. The subsequent fieldwork took place in June 2011.
The evaluation trenching comprised four 30m long trenches located along the easement within Field 3. Of these, Trench 3 was targeted to investigate a depression present in the field. The evaluation of this trench revealed a tree-bole, a gully and a posthole. Trenches 1, 2 and 4 were located along the easement within the field and of these, trenches 1 and 2 contained three small postholes. Nothing of archaeological interest was observed in Trench 4.

Item Type: Client Report
Subjects: Geographical Areas > English Counties > Cumbria
Period > None
Divisions: Oxford Archaeology North
Depositing User: Mr Peter Schofield
Date Deposited: 12 Feb 2014 13:23
Last Modified: 25 May 2023 13:31
URI: http://eprints.oxfordarchaeology.com/id/eprint/1445

Actions (login required)

View Item
View Item